稀缺资源呦视频在线网站,国产永久免费爽视频在线,一二三区精品福利视频,2018天天干夜夜操

從事濟(jì)南彩鋼板房,彩鋼瓦,復(fù)合板,巖棉板,C型鋼,濟(jì)南鋼結(jié)構(gòu)的廠家
服務(wù)電話:0531-83658718
熱門搜索:濟(jì)南方管,濟(jì)南彩鋼瓦,濟(jì)南巖棉板,濟(jì)南型鋼,濟(jì)南樓承板,濟(jì)南泡沫復(fù)合板
公司動態(tài) 所在位置- 首頁-新聞中心-公司動態(tài)復(fù)合巖棉板制作時需要注意4個問題

復(fù)合巖棉板制作時需要注意4個問題

發(fā)布時間:2022-12-27 來源:http://m.qianhairuiben.com/

復(fù)合巖棉板的結(jié)構(gòu)主要分為四層:膠粘劑層,隔熱層,涂片層,涂料層及相關(guān)輔料。粘合劑層在底層和表面層之間,并且上層和下層與膠凝材料牢固地結(jié)合在一起。復(fù)合巖棉板制作時需要注意4個問題,下面濟(jì)南巖棉板廠家為你解析。
The structure of composite rock wool board is mainly divided into four layers: adhesive layer, thermal insulation layer, smear layer, coating layer and related auxiliary materials. The adhesive layer is between the bottom layer and the surface layer, and the upper layer and the lower layer are firmly combined with the cementitious material. There are four problems that should be paid attention to when making composite rock wool board. The following is the analysis of Jinan rock wool board manufacturer.
<一>:根據(jù)生產(chǎn)工藝參數(shù),規(guī)定了復(fù)合巖棉板出廠前的技術(shù)要求。復(fù)合巖棉板安裝后,復(fù)合巖棉板的外觀應(yīng)達(dá)到相同的顏色卡號,復(fù)合巖棉板不應(yīng)有色差缺陷。復(fù)合巖棉板的外部不應(yīng)有明顯的沖擊或劃傷,是否缺少配套配件,面板、天花板、墊子、底槽等附件是否會到達(dá)。
<1> According to the production process parameters, the technical requirements for composite rock wool board before delivery are specified. After the composite rock wool board is installed, the appearance of the composite rock wool board shall reach the same color card number, and the composite rock wool board shall be free of color difference defects. There should be no obvious impact or scratch on the exterior of the composite rock wool board, whether there is a lack of supporting accessories, and whether the panel, ceiling, mat, bottom slot and other accessories will arrive.
濟(jì)南巖棉板
<二>:復(fù)合巖棉板要經(jīng)過質(zhì)量檢查之前,進(jìn)廠,并擁有產(chǎn)品,不符合質(zhì)量檢測認(rèn)可產(chǎn)品的證書在船上不允許安裝。建設(shè)工作都應(yīng)該施工工具:卷尺,石筆,打箱,型材切割機,焊接工具,錘子,等準(zhǔn)備好了。
<2> : The composite rock wool board shall enter the factory before quality inspection and have products. The certificate of unqualified products is not allowed to be installed on board. Construction tools should be prepared for construction: tape measure, stone pen, boxing, profile cutting machine, welding tools, hammer, etc.
<三>:焊工上崗。合格的焊工評估和采取行動之前達(dá)到三級資質(zhì)。當(dāng)電焊工上崗,就須佩戴特殊工種執(zhí)照。工藝要求。根據(jù)現(xiàn)有技術(shù)的技術(shù)制造復(fù)合巖棉板需要預(yù)定的生產(chǎn)參數(shù)。安裝在同一色卡的復(fù)合巖棉板出現(xiàn)后應(yīng)達(dá)到復(fù)合巖棉板不能有顏色缺陷。
<3> : Welders are on duty. Qualified welders shall be qualified to Level III before assessment and action. When electric welders are on duty, they must wear a special type of work license. Process requirements. The predetermined production parameters are required for manufacturing composite rock wool board according to the prior art. The composite rock wool board installed on the same color card shall be free of color defects after appearance.
<四>:如果損傷區(qū)域較大或劃痕長度大于必要的變化,則在復(fù)合巖棉板外側(cè)不應(yīng)有明顯的沖擊或劃痕。門框上方隔倉復(fù)合巖棉板安裝工藝規(guī)范,下板為門框?qū)挾认嗤拿姘澹E線。一定沒有針跡。復(fù)合巖棉板安裝后,整個板的垂直度是板縫的平整度,復(fù)合巖棉板的頂平面度是板縫的平整度。天花板和頂部輪廓之間的間隙不大于。頂棚縫線應(yīng)在同一直線上。
<4> : If the damage area is large or the scratch length is greater than the necessary change, there should be no obvious impact or scratch outside the composite rock wool board. The installation process specification for the partition composite rock wool board above the door frame is as follows: the lower plate is a panel with the same width as the door frame, with traces. There must be no stitch. After the composite rock wool board is installed, the perpendicularity of the whole board is the flatness of the board joint, and the top flatness of the composite rock wool board is the flatness of the board joint. The gap between the ceiling and the top profile is not greater than. The ceiling seam shall be in the same straight line.
復(fù)合巖棉板是巖棉板的一個延伸,復(fù)合巖棉板主要用于墻體保溫,屋頂保溫,門保溫和地板保溫,但重要的是墻體保溫的應(yīng)用。你有需求就來我們網(wǎng)站http://m.qianhairuiben.com咨詢了解吧!
Composite rock wool board is an extension of rock wool board. Composite rock wool board is mainly used for wall insulation, roof insulation, door insulation and floor insulation, but the most important is the application of wall insulation. Come to our website if you need http://m.qianhairuiben.com Ask and understand!