稀缺资源呦视频在线网站,国产永久免费爽视频在线,一二三区精品福利视频,2018天天干夜夜操

從事濟(jì)南彩鋼板房,彩鋼瓦,復(fù)合板,巖棉板,C型鋼,濟(jì)南鋼結(jié)構(gòu)的廠家
服務(wù)電話:0531-83658718
熱門搜索:濟(jì)南方管,濟(jì)南彩鋼瓦,濟(jì)南巖棉板,濟(jì)南型鋼,濟(jì)南樓承板,濟(jì)南泡沫復(fù)合板
行業(yè)資訊 所在位置- 首頁-新聞中心-行業(yè)資訊彩鋼瓦的防水基層作業(yè)條件是什么?

彩鋼瓦的防水基層作業(yè)條件是什么?

發(fā)布時(shí)間:2021-10-12 來源:http://m.qianhairuiben.com/

我們知道彩鋼瓦的使用越來越普遍,它會(huì)用做防水基層作業(yè)當(dāng)中進(jìn)行防水作用,但在此使用過程中也是有一定的條件,否則如果使用條件不滿足的話,很可能降低產(chǎn)品的使用效果,接下來我們就一起來了解下該產(chǎn)品的防水基層作業(yè)條件有哪些。
We know that the use of colored steel tile is becoming more and more common. It will be used for waterproof base course operation, but there are certain conditions in this use process. Otherwise, if the use conditions are not met, it is likely to reduce the use effect of the product. Next, let's understand the waterproof base course operation conditions of the product.
1、嚴(yán)冬施工彩鋼瓦上要刷基層處理劑。
1. The base treatment agent shall be applied on the color steel tile during construction in severe winter.
2、基面無塵土、無松動(dòng)。松動(dòng)部分處理后才能施工。
2. The foundation surface shall be free of dust and looseness. The loose part can be constructed only after treatment.
3、基面不得有積水現(xiàn)象,如發(fā)現(xiàn)彩鋼瓦有積水,需要進(jìn)行加固處理,合格后方可進(jìn)行防水層施工。
3. There shall be no ponding on the foundation surface. If ponding is found on the color steel tile, it shall be reinforced. The waterproof layer construction can be carried out only after it is qualified.
4、早上施工,發(fā)現(xiàn)該產(chǎn)品面有露水時(shí),要停止施工。
4. During construction in the morning, when dew is found on the surface of the product, the construction shall be stopped.
5、彩鋼瓦縫隙超過0.3mm時(shí)要進(jìn)行加固處理,處理后方可進(jìn)行施工。
5. When the gap of color steel tile exceeds 0.3mm, it shall be reinforced before construction.
通過以上介紹,我們對(duì)彩鋼瓦的防水基層作業(yè)條件有了進(jìn)一步的了解,我們?cè)谑褂迷摦a(chǎn)品的時(shí)候要按照使用要求進(jìn)行安裝,不要隨心操作,這樣牢固性可能沒法保證,除此之外,我們?cè)趯?duì)該產(chǎn)品進(jìn)行加固處理的時(shí)候,也要待其性能穩(wěn)定后再進(jìn)行下一步。
Through the above introduction, we have a further understanding of the working conditions of the waterproof base course of the color steel tile. When using the product, we should install it according to the use requirements and do not operate at will. In addition, the firmness may not be guaranteed. In addition, when strengthening the product, we should wait until its performance is stable.